Last week was mostly spent setting up the shop. My A/V company has some extra warehouse space so after moving various pallets of amps, speakers, theatrical lighting, we found a nice corner for the project.


Lift.jpg

We aren’t swimming in money, but we do like the safety and efficiency of a hydraulic lift. It made sense with the amount of fabricating that needs to be done top and bottom, in addition to the typical restoration work.

To save $400 in freight, I opted to pick it up in Los Angeles. Using my short-bed Tundra only half of it hung past the tailgate so wheelies were enjoyed in rush hour traffic on the 405.


Rust-1.jpg

Once the lift was setup, we finally got to get a good look under the car. We found various rust repairs that appear to have been performed in decade intervals. I was surprised not to see any duct tape.

This is going to be more fun than we thought!


Finally, we printed out and posted a reminder of the goal on the wall. When we find ourselves elbow-deep in rust, welders, batteries and wires we may risk losing sight of the dream. I assume that a poster will be all it takes to get us back on track :)

Keep Going.jpeg

Until next time,

Paul